Electric Circuit Board Related Parts

Panel Assy
Required OperationsService ProgramToolsPaper TypeReplacedReattached
Replacement1Parts replacement

---



After replacement2Power ON (Inspection mode)---

3Display Check



Wireless LAN (WLAN) Board
Required OperationsService ProgramToolsPaper TypeReplacedReattached
Replacement1Parts replacement---

CH83 Sub IF Board
Required OperationsService ProgramToolsPaper TypeReplacedReattached
Replacement1Parts replacement---

CE46 SUB-C Board
Required OperationsService ProgramToolsPaper TypeReplacedReattached
Replacement1Parts replacement---

TPM (CH35 SUB T) Board
Required OperationsService ProgramToolsPaper TypeReplacedReattached
Before replacement1Power ON (Repair mode)---

---

2Back up encryption data to USB memory

---



---

3Power OFF---

---

Replacement4Parts replacement---

After replacement5Power ON (Repair mode)---

---
6Restore encryption data to USB memory---

---
7Power ON (Repair mode)---

---
8TPM (CH35 SUB T) Board Replacement Date & Time Setting



---
Printer Main Circuit Board (With SSD/PS) (NVRAM backup OK)
Required OperationsService ProgramToolsPaper TypeReplacedReattached
Before replacement1Power ON (Repair mode)---

---

2

NVRAM Data Backup & Restore (Backup)



---

3Power OFF---

---

Replacement4Parts replacement---

After replacement5Remove the TPM (CH35 SUB T) board and SSD---

---
6Power ON (Printer starts up in inspection mode)---

---

7Firmware Install



---
8The printer automatically starts up in inspection mode

---



---
9Power OFF---

---
10Power ON (Printer starts up in inspection mode)---

---
11Write Setting Value Information



---
12Power ON (Repair mode)---

---
13Write NW/Authentication Data



---
14Assemble the TPM (CH35 SUB T) Board and SSD---

---
15Power ON (Repair mode)---

16RTC Check & Input



---
17Date and Time Settings from LCD Panel---

---
18SSD Check



---
19PS3 Unit Check



---
20Main Circuit Board Replacement Date & Time Setting



---
21Nozzle Verification Technology Noise Check


PGPP250 16 inches or more

22Nozzle Verification Technology Trouble Check


PGPP250 16 inches or more

Printer Main Circuit Board (With SSD/PS) (NVRAM backup NG)
Required OperationsService ProgramToolsPaper TypeReplacedReattached
Replacement1Parts replacement---

After replacement2Remove the TPM (CH35 SUB T) board and SSD---

---
3Power ON (Printer starts up in inspection mode)---

---

4

Firmware Install



---
5The printer automatically starts up in inspection mode

---



---
6Power OFF

---



---
7Power ON (Printer starts up in inspection mode)

---



---
8Main Circuit Board Initial Setting



---
9Power ON (Repair mode)---

---

10

Input Offset Value



---
11Power OFF---

---
12Assemble the TPM (CH35 SUB T) Board and SSD---

---
13Power ON (Repair mode)---

14Suction Fan Input & Check



---
15RTC Check & Input



---
16Date and Time Settings from LCD Panel---

---
17MAC Address Check & Input

Network cable

---
18Serial Number Input



---
19Initial Password Check & Input (EMEA only)



---
20SSD Check



---
21PS3 Unit Check



---
22Main Circuit Board Replacement Date & Time Setting



---
23Head ID Check & Input



---
24Power ON (Repair mode)---

---
25CR Motor Measurement & Auto Adjustment



---
26PF Motor Measurement & Auto Adjustment



---
27Sub PF Motor Measurement & Auto Adjustment



---
281st Roll Paper Motor Measurement & Adjustment


New PGPP250 24 inches

---
292nd Roll Paper Motor Measurement & Adjustment


New PGPP250 24 inches

---
301st / 2nd Release Motor Measurement & Adjustment



---
31Cutter Motor Measurement & Auto Adjustment



---
32Cutter Motor Life Span Measurement & Auto Adjustment



---
33Pump Cap Unit Measurement & Auto Adjustment



---
34Power OFF---

---
35Power ON (Inspection mode)---

---
36Rear AD Adjustment (UPE)

Standard sheet (JETRAS)

---
37Rear AD Adjustment (BPE)

Standard sheet (JETRAS)

---
38Power OFF---

---
39Power ON (Repair mode)---

---
40Head Alignment Check


PGPP250 16 inches or more

41Nozzle Verification Technology Noise Check


PGPP250 16 inches or more

42Nozzle Verification Technology Trouble Check


PGPP250 16 inches or more---

43Nozzle Verification Technology Rank Sort (including initialization)


PGPP250 16 inches or more

---
44Nozzle Verification Technology Check


PGPP250 16 inches or more

---
45PG Check & Adjustment

Feeler Gauge

---

46

Paper Feed Adjustment


PGPP250 16 inches

---
47PW Sensor Check & Adjustment


Matte Paper A4

---
48T&B&S Check & Adjustment

Scale
  • Matte Paper A4
  • Plain paper A3/Tabloid

---
49Cut Position Check & Adjustment

ScalePGPP250 16 inches or more

---
50Uni-D Alignment


PGPP250 16 inches or more

---

51

Bi-D Adjustment


PGPP250 16 inches or more

---
52Ruled Line Deviation Adjustment (Auto)/Ruled Line Deviation Adjustment (Manual)


Cut sheet paper feed: PGPP250 16 inches

Roll paper feeding

  • 44 inch machine: PGPP250 44 inches
  • 36 inch machine: PGPP250 36 inches
  • 24 inch machine: PGPP250 24 inches

---
53Colorimetric & Raster Calibration

Calibrator
  • Plain paper (A4 / Letter or larger size, roll paper is acceptable)
  • 2 sheets of matte paper A3 / Tabloid (11 x 17 inch)

---
Printer Main Circuit Board (Without SSD/PS) (NVRAM backup OK)
Required OperationsService ProgramToolsPaper TypeReplacedReattached
Before replacement1Power ON (Repair mode)---

---

2

NVRAM Data Backup & Restore (Backup)



---

3Power OFF---

---

Replacement4Parts replacement---

After replacement5Remove the TPM (CH35 SUB T) board and SSD---

---
6Power ON (Printer starts up in inspection mode)---

---

7Firmware Install



---
8The printer automatically starts up in inspection mode

---



---
9Power OFF---

---
10Power ON (Printer starts up in inspection mode)---

---
11Write Setting Value Information



---
12Power ON (Repair mode)---

---
13Write NW/Authentication Data



---
14Assemble the TPM (CH35 SUB T) Board and SSD---

---
15Power ON (Repair mode)---

16RTC Check & Input



---
17Date and Time Settings from LCD Panel---

---
18Main Circuit Board Replacement Date & Time Setting



---
19Nozzle Verification Technology Noise Check


PGPP250 16 inches or more

20Nozzle Verification Technology Trouble Check


PGPP250 16 inches or more

Printer Main Circuit Board (Without SSD/PS) (NVRAM backup NG)
Required OperationsService ProgramToolsPaper TypeReplacedReattached
Replacement1Parts replacement---

After replacement2Remove the TPM (CH35 SUB T) board and SSD---

---

3Power ON (Printer starts up in inspection mode)---

---

4Firmware Install



---

5The printer automatically starts up in inspection mode---

---

6

Power OFF---

---
7Power ON (Printer starts up in inspection mode)---

---
8Main Circuit Board Initial Setting



---
9Power ON (Repair mode)---

---
10Input Offset Value



---
11Power OFF---

---
12Assemble the TPM (CH35 SUB T) Board and SSD---

---
13Power ON (Repair mode)---

14Suction Fan Input & Check



---
15RTC Check & Input



---
16Date and Time Settings from LCD Panel---

---
17MAC Address Check & Input

Network cable

---
18Serial Number Input



---
19Initial Password Check & Input (EMEA only)



---
20Main Circuit Board Replacement Date & Time Setting



---
21Head ID Check & Input



---
22Power ON (Repair mode)---

---
23CR Motor Measurement & Auto Adjustment



---
24PF Motor Measurement & Auto Adjustment



---
25Sub PF Motor Measurement & Auto Adjustment



---
261st Roll Paper Motor Measurement & Adjustment


New PGPP250 24 inches

---
272nd Roll Paper Motor Measurement & Adjustment


New PGPP250 24 inches

---
281st / 2nd Release Motor Measurement & Adjustment



---
29Cutter Motor Measurement & Auto Adjustment



---
30Cutter Motor Life Span Measurement & Auto Adjustment



---
31Pump Cap Unit Measurement & Auto Adjustment



---
32Power OFF---

---
33Power ON (Inspection mode)---

---
34Rear AD Adjustment (UPE)

Standard sheet (JETRAS)

---
35

Rear AD Adjustment (BPE)

Standard sheet (JETRAS)

---
36Power OFF---

---
37Power ON (Repair mode)---

---
38Head Alignment Check


PGPP250 16 inches or more

39Nozzle Verification Technology Noise Check


PGPP250 16 inches or more

40Nozzle Verification Technology Trouble Check


PGPP250 16 inches or more---

41Nozzle Verification Technology Rank Sort (including initialization)


PGPP250 16 inches or more

---
42Nozzle Verification Technology Check


PGPP250 16 inches or more

---
43PG Check & Adjustment

Feeler Gauge

---

44

Paper Feed Adjustment


PGPP250 16 inches

---
45PW Sensor Check & Adjustment


Matte Paper A4

---
46T&B&S Check & Adjustment

Scale
  • Matte Paper A4
  • Plain paper A3/Tabloid

---
47Cut Position Check & Adjustment

ScalePGPP250 16 inches or more

---
48Uni-D Alignment


PGPP250 16 inches or more

---
49Bi-D Adjustment


PGPP250 16 inches or more

---
50Ruled Line Deviation Adjustment (Auto)/Ruled Line Deviation Adjustment (Manual)


Cut sheet paper feed: PGPP250 16 inches

Roll paper feeding

  • 44 inch machine: PGPP250 44 inches
  • 36 inch machine: PGPP250 36 inches
  • 24 inch machine: PGPP250 24 inches

---
51Colorimetric & Raster Calibration

Calibrator
  • Plain paper (A4 / Letter or larger size, roll paper is acceptable)
  • 2 sheets of matte paper A3 / Tabloid (11 x 17 inch)

---
CH12Power Supply Board
CH83 Main-B Circuit Board
Required OperationsService ProgramToolsPaper TypeReplacedReattached
Replacement1Parts replacement---

After replacement2Power ON (Firmware Update Mode)---

---

3Firmware Install



---

4Power ON (Repair mode)---

5Main-B Board Replacement Date & Time Setting



---
6Head Alignment Check


PGPP250 16 inches or more

7Nozzle Verification Technology Noise Check


PGPP250 16 inches or more

8Nozzle Verification Technology Trouble Check


PGPP250 16 inches or more

CH83 DRV-H Board Cooling Fan
Required OperationsService ProgramToolsPaper TypeReplacedReattached
Replacement1Parts replacement---

CH83 SUB (PW/IMS) Board
Required OperationsService ProgramToolsPaper TypeReplacedReattached
Replacement1Parts replacement---

After replacement2Power ON (Repair mode)---

3IMS Adjustment


PGPP250 16 inches or more

4PW Sensor Check & Adjustment


Matte Paper A4

5T&B&S Check & Adjustment

Scale
  • Matte Paper A4
  • Plain paper A3/Tabloid

CH83 DRV-H Board
Required OperationsService ProgramToolsPaper TypeReplacedReattached
Replacement1Parts replacement---

After replacement2Power ON (Repair mode)---

3DRV-H Board Replacement Date & Time Setting



---
4Nozzle Verification Technology Noise Check


PGPP250 16 inches or more

5Nozzle Verification Technology Trouble Check


PGPP250 16 inches or more